Driveways in Mountain Ash
Tell us what you need and see an honest price for Mountain Ash straight away — then book a survey without leaving the page. Most driveways take 3 to 7 days.
DonnaHiya! Tell me a bit about the job in Mountain Ash and I’ll price it for you right now.
Instant price · Mountain Ash
Driveway installer from £910 in Mountain Ash
A few quick taps and you'll see your price on the screen. No waiting for a call back.
What sort of driveway?
Guide prices in Mountain Ash
| Job | Typical price |
|---|---|
| Block paving | £3,680 – £4,880 |
| Resin bound | £3,495 – £4,635 |
| Tarmac | £2,760 – £3,660 |
| Imprinted concrete | £3,125 – £4,145 |
| Gravel | £1,655 – £2,195 |
| Porcelain | £4,780 – £6,340 |
Dig out, sub-base, edging and surface for about 40m². Drainage channel included. Guides include VAT and are based on typical Mountain Ash prices. Your exact price comes from your answers.
Common problems we're asked about
- Cracked or sunken driveway
- Weeds coming through block paving
- Wanting off-road parking
- Puddles that won't drain
- Tired tarmac
What to expect
An installer will measure up, look at levels and drainage, and talk through materials. Most of the cost is in the digging out and base, which is what makes a drive last.
Most driveways take 3 to 7 days.
How Honest HQ works in Mountain Ash
Donna prices itA few taps, one question at a time — and a price on the screen worked out for Wales.
Stella books your surveyPick a slot there and then. The surveyor confirms the price before any work starts.
Grace sees it throughShe keeps you posted, and checks the job’s been done right in Mountain Ash.
Questions people ask
How much does a driveway installer cost in Mountain Ash?
Most driveways jobs in Mountain Ash start from about £910, and block paving is typically £3,680 – £4,880. Prices in Wales are worked into every figure. Answer a few questions above for your own price.
Do I need planning permission?
Usually not if it's permeable (lets water through) or drains to a lawn or border. Non-permeable drives over 5m² at the front may need it.
What's a dropped kerb?
It's the lowered kerb that lets you drive onto your property legally. Your council has to approve it.
Which material lasts longest?
Block paving and resin both last well when the base is done properly. Gravel is the cheapest but needs topping up.
Other jobs in Mountain Ash
Patio installerFencerLandscaperGutter fitterExterior decoratorWindow fitterLighting installer